Annie Area Interim Drainage Improvements
The Annie Area Interim Drainage Improvements project alleviated flooding from properties on Holland Avenue and Annie Street. The project consisted of replacing the sidewalk bridge on Holland Avenue, adding...
Biering Lane Interim Drainage Improvements
The Biering Lane Interim Drainage Improvements project completed a design to help alleviate flooding to the Oakridge Point Neighborhood. Phase: CompletedFor more information: Joe Hinojosa, (210)...
Blue Crest Drainage
The Blue Crest Drainage project constructed an easement across a property on Blue Crest and a channel to capture water flow coming from upstream to alleviate flooding to properties on Plumeria Street and...
Breeden - West Russell Area Drainage Improvements
The Breeden - West Russell Area Drainage Improvements project included two phases. Phase 1 included an underground drainage system to alleviate flooding issues associated with the lack of a drainage...
Briarmall Drainage System
The Briarmall Drainage System project constructed a storm water system comprised of channels, inlets, and an underground drainage system to better capture, contain, and convey storm water downstream impacting...
Castleridge/Slick Ranch Floodplain Improvements
The Castleridge/Slick Ranch Floodplain Improvements project will reconstruct a natural earthen channel, removing 395 properties from the 100-year floodplain.Phase: ConstructionFor more information: Call...
Churchill Avenue Area Drainage Improvements
The Churchill Avenue Area Drainage Improvements project constructed a drainage system comprised of culvert crossings and an earthen channel, and improved low water crossings at Chole Drive, Churchill...
Concepcion Creek Drainage Project
The Federal Emergency Management Agency (FEMA) is revising its flood maps to identify which homes and parcels of land in San Antonio could be at risk of flooding during heavy rainfall. As the federal agency...
Contessa Drive Drainage Improvements
The Contessa Drive Drainage Improvements project alleviated flooding along Contessa Drive. Improvements included new underground storm drainage infrastructure, street reconstruction, as well as new curbs,...
Crestfield Area Drainage Improvements
The Crestfield Area Drainage Improvements project alleviated flooding within the surrounding neighborhood. Improvements included the construction of a concrete channel, outfall structures, energy dissipators,...
Jo Marie Area Drainage Improvements
The Jo Marie Area Drainage Improvements project constructed a new underground drainage system to alleviate flooding along Jo Marie Street.Phase: CompleteFor more information: Joe Hinojosa, (210)...
Menchaca Street Drainage Improvements
The Menchaca Street Drainage Improvements project alleviated drainage concerns for properties along the northside of Menchaca Street. Improvements included regrading the street’s cross-section to...
Michael Avenue Drainage Improvements
The Michael Avenue Drainage Improvements project alleviated ponding water impacting properties and within the street. Improvements included realignment and regrading of the adjacent channel. Phase:...
Moss Brook Area Drainage
The Moss Brook Area Drainage project alleviated flooding on properties along Moss Brook Drive. Improvements included reconstructing an existing concrete V-shaped channel to a rectangular channel, street...
Orsinger Low Water Crossing
The Orsinger Low Water Crossing (LWC) #35 project included channel improvements, street reconstruction, and the replacement of an existing small pipe culvert on Orsinger with larger box culverts. Phase: CompleteProject...
Parham Street Drainage Improvements
This Parham Street Drainage Improvements project will include street reconstruction and a drainage system to alleviate flooding and properly convey water runoff into the existing earthen...
Pembroke Interim Drainage Improvements
The Pembroke Interim Drainage Improvements project alleviated storm water runoff onto a property on Pembroke Road. Improvements included an earthen berm, earthen pilot channel, and an outfall. Phase: CompleteProject...
Pinn Road LWC Safety Improvements
The Pinn Road Safety Improvements Project will include the installation of Advanced Warning devices for vehicular and pedestrian traffic around low water crossings. The devices will include mast arms,...
Riverwalk Gate 5 Replacement
The Riverwalk Gate 5 Replacement project will be replacing Gate 5 located at the southwest quadrant of E. Nueva and Jack White intersection. This gate is utilized to control water levels along the Riverwalk...
South Gevers St. Drainage Improvements Phase 1
The South Gevers St. Drainage Improvements Phase 1 project included the installation of an underground drainage system along South Gevers Street and tied it into an existing underground system along Nopal...
Thousand Oaks Erosion Protection
Concrete riprap under Thousand Oaks bridge is in disrepair and breaking off exposing the bluff which has led to extreme erosion in this area. Storm water runoff from two culverts combine east of Thousand...
Woller Road Interim Drainage Improvements
The Woller Road Interim Drainage Improvements project included the combination of a flume and roadwork designed to move water out of the Woller Road and Corian Path intersection into the adjoining drainage...
WW White/MLK Interim Drainage Improvements
The WW White/MLK Interim Drainage Improvements project alleviated localized flooding along the west side of WW White Road at Martin Luther King Drive, specifically at the VIA bus stop north of the intersection....